We work on the resident's relationship with their building neighbors and with the urban environment.
Calculation and structural design of the housing and commercial complex.
Design and writing of the Execution Project.
Mixed steel girder bridge.
Roundabout on Strasburg Avenue in Xàbia (Alicante)
Bow-string type steel arch walkway with a span of 20 m
Expansion due to elevation of a hospital
280 meter long walkway with 20 meter spans.
It is an urban bridge, on the border between the city and the orchard. The bridge has a span of 30 m and a main arch height of 8 meters.
Structural reinforcement of the foundation and design of the façade supporting structure
70 meter long walkway with spans of 20 and 30 meters made of steel.
Arched cycle-pedestrian walkway over the CV-326. 30 meter long walkway formed by a mixed steel-wood arch.
Orthotropic box and lateral beam with spans of 40 meters.
It is a road bridge next to the sea made of prestressed concrete and a 43 m span wooden walkway.
Exhibition spaces and show rooms
Design and execution project of two maintenance walkways on the Vera campus (Universitat Politècnica de València).
This is the expansion and renovation of the surgical block of the Elche hospital
The project consists of the rehabilitation of a building located in the Cabanyal neighborhood
The project consists of the removal of 4 pillars on the ground floor of a sports center
The project proposes a series of actions to recover the structural capacity of the complex.
Office building with unique roof
Pedestrian bridge over riverbed.
This is the rehabilitation of a stately building with a basement and ground floor plus 3 upper floors.
A study of structural alternatives to the original project has been carried out to simplify the execution of the building.
Renovation of exterior facades and interior conditioning.
Residential building with 59 homes
Design and calculation of new and rehabilitation structures
Raval Auxiliary Health Center - University of Castelló
Curved road bridge over riverbed.
Road bridge over the Barranco del Cint.
Structural work for the creation of a staircase, a planter and logo support, a SAS and some polycarbonate sheds.
Carrefour office headquarters in Courcouronnes
30,000 m³ reinforced concrete pond
Public building of 550 m2. Steel structure and stainless steel facade.
Study on exostructures in housing
35m structure. high that can carry up to 15 passengers sitting around a bar.
Football and athletics stadium. 70,000 m2, capacity for 40,000 spectators.
Execution project of the metal structure of the building and the canopies of the Elche AVE station.
Rehabilitation of a 9000 m² building
2100 m2 building with concrete structure.
30 m span walkway.
It is a cultural building that allows a wide variety of uses
Rehabilitation and expansion of a 1600 m2 commercial premises, demolition of the ground floor ceiling.
Design and calculation of several concrete road bridges.
Rehabilitation of a commercial premises of approximately 2000 m².
Rehabilitation and optimization of the structure of a commercial premises.
Metal roof of 10,000 m2.
Underpass 250 m long, with diaphragm walls (350 piles), under train tracks.
Rehabilitation of the old headquarters of the Bank of Spain.